1. Establish into place a cover of a head of cylinders with new sealing laying, without fixing it.
|
Screws of fastening drag on only after installation of injectors. |
2. Establish nozzles, address the Section Removal and installation of nozzles. 3. Fix cable channel to a cover of a head of cylinders.
|
For installation of cable channel it is necessary to remove fuel injection pipelines again. |
4. Join sockets of the valve of shutdown and Hall's sensor on the camshaft. 5. Connect a hose of ventilation of a case. 6. Establish a casing of the air filter. 7. Establish the top covers of the engine, address appropriate section. |