3648d64d

9.3.9. Dismantling and assembly of a back hollow shaft with the back coupling of a free wheeling

Dismantling and assembly of a back hollow shaft with the back coupling of a free wheeling

45a — the Hollow shaft
45b — the Sealing ring
45s — the Lock ring
45d — the Coupling of a free wheeling
45e — the Back solar gear wheel with an internal support of coupling K3
45f — the Persistent needle bearing
45g — Laying
45h — the Blocking ring

Dismantling

 PERFORMANCE ORDER

1. Disconnect the transmission case from the case the hydrotransformer.
2. Remove multidisk couplings of K1, K2 and K3.
3. Remove a blocking ring (45h), laying (45g) and the persistent needle bearing (45f) from a hollow shaft (45a).
4. Remove a back solar gear wheel (45e) together with an internal support of coupling K3 and the back coupling of a free wheeling (45d).
5. Remove a lock ring (45s) from the coupling of a free wheeling (45d).
6. Remove the coupling of a free wheeling from a solar gear wheel.


Assembly

 PERFORMANCE ORDER

Assembly is carried out as it should be, the return to dismantling. Check correctness of installation of lock rings. Check them and if it is necessary, replace them. Persistent laying of the coupling of a free wheeling (45d) has to settle down in the direction to a lock ring (45s).